A ziaktu: Site Editor Thuchhuah Hun: 2024-06-19 A chhuahna hmun: Hmun
Chumi 48V Battery Bank Online Remote Capacity Testing Solution by DFUN hian remote capacity testing, energy hmanga discharging, intelligent charging, battery monitoring, leh battery activation te a thlunzawm a ni. He solution kimchang tak hian kut hmanga enfiahnain hun leh tha a hman dan te, offline capacity test-na harsatna te, leh hmun darh zau tak tak atanga maintenance chungchanga harsatna lo awm te ang chi harsatnate chu a tha thei ang bera a hmachhawn a ni. Substation, control center, leh energy storage power plant atan a tha hle.
1. Remote online a capacity testing .
Charging leh discharging-na hmun hla tak atanga control theih a ni. Maintenance plan siam theih a ni a, battery bank chuan a hun ruat angin discharging a execute thei bawk.
2. Energy hmanga pek chhuah .
DC/DC voltage boost hmangin load tak tak chu discharge la, additional dummy load tel lovin. Power hloh chu 5% aia tlem a ni.
3. Intelligent Charging .
Three-stage intelligent charging hian battery bank chu undercharged leh overcharged a nih loh nan a enkawl a ni.
4. Online-a battery hmanga enfiah .
Battery voltage, current, internal resistance, temperature, SOC (state of charge), leh SOH (State of Health) te chu battery hriselna dinhmun a hriat theih nan real-time monitoring.
48V power system atan a tha a, substation, telecom site, leh rel kawng hmanga lirthei kalna tur a ni.
Remote capacity testing, energy hmanga discharging, fing taka charging, battery enkawlna, leh battery activation te a inzawm khawm a ni.
Busbar voltage inthlauhna balance turin pre-charge function hmanga thuam a ni a, voltage danglamna leh battery-a current nghawng lian tak a awm loh nan a veng thei bawk.
Electrical primary leh secondary side structure isolation design a ni a, anti-interference theihna chak tak a pe a, a thawk tha hle bawk.
Constant current discharging, physical circuit isolation, leh real load discharging, heat generation hniam leh safety factor sang tak te chu boost rawh.
Online-a capacity test him tak neih theihna turin capacity testing process 18 thleng process judgment strategy.
Built-in touch-screen HMI hmanga hman theih tur interface, operation awlsam tak, leh logical layer chiang tak tak te a awm bawk.
Kum thum chhung zet historical data dahkhawmna hmangin capacity testing report chu automatic-in a siam chhuak thin. Data leh report te chu zawn theih leh export theih a ni.
Internal resistance leh impedance te hi eng nge an danglamna?
Wired vs. Wireless Battery Monitoring System eng ber nge tha zawk
DFUN Tech: Battery hman dan leh enkawlna hun fing tak hmahruai
Distributed vs. centralized battery monitoring system: a tha, a tha, leh a hmanna tur tha ber berte
Battery monitoring system leh renewable energy sources te inzawmkhawmna
UPS application atana battery monitoring system hman dan tur tha ber .